Sunday, June 5, 2011

Waiting Game

We are now having to wait for our framer to be done with another job and ready to start ours.  I think we will have several periods of waiting before this house is done.  Hopefully that will give us time to pick out fixtures, trim colors to match the brick already ordered etc.  It also gives us time to just concentrate on summer.  I am finally finished with work!

P6020070

From a bulletin board at work! woo hoo!

Now I just have to coordinate the boys’ workouts schedules.  Grant will be joining Preston doing workouts for football, baseball and basketball this summer!  They pretty much start at 9 and go until 7+ pm 3 days a week!  Preston will also be taking a driver’s ed course one week and Ryan will be taking golf lessons each Tuesday!  I need to schedule doctor’s and dentist appts as well as carve out time to scrapbook, clean and swim!  We have new renters in MD so we will be heading that way to see one off and make sure the house is ready for another.  I would like to take time on the way back to AL to see some East Coast sights we usually just drive by…any suggestions?  The beach is just under 2 hours away and I hope we get there once or twice!  Summer is just not long enough! :)  It has been 95-102 each day for a week or so, with NO rain in about a month!  The dogs just got out a ran to the pond to cool off.  We found them quickly and drug them back to the hot backyard…poor things.  They do have a baby pool with water to lay in.

Here are a few pictures from our unofficial start of Summer…Memorial Day.

 ryan musical theater singles 002

Wrestling…..

ryan musical theater singles 003 ryan musical theater singles 005 ryan musical theater singles 006

Flipping……

ryan musical theater singles 007

Eating…..RIBS  YUM!

A “good” foundation

Finally it was time to pour the foundation.  I had to be at work (my last day).  Dennis took the boys over early so they could see the cement being poured and so they could put their handprints in the foundation.  He had to get to work so my dad helped the kids with their handprints when it was finally time.

6-3-11 (29) 6-3-11 (2)

By the time they got there, the work had already begun.  It has been 100 degrees so I am sure they were trying to beat the heat. Grandaddy was already there supervising!

6-3-11 (3) 6-3-11 (4) 6-3-11 (6) 6-3-11 (8) 6-3-11 (11) 6-3-11 (15) 6-3-11 (17) 6-3-11 (23)

Finally finished

6-3-11 (26) 6-3-11 (27)

The boys making handprints on the front porch!  I hope they stay forever!

Foundation Prep

Before the foundation can be poured, the dirt has to be treated for termites and the dirt has to be repacked around the plumbing and electric.  A plastic barrier seal is placed over the packed dirt.

6-2-11 (12)

Left side

6-2-11 (3)

front porch

6-2-11 (4)

Master bath, kitchen, laundry/mud room

6-2-11 (5)

Garage

6-2-11 (8) 6-2-11 (9)

“Rouging in”

After all that “beautiful” Alabama red clay was brought in and packed down, it had to be dug up in places to “rough in” the plumbing and electric that will be under the foundation.  Seems crazy but I am not a plumber.  The drains for tubs, showers, sinks etc. were put in.

 5-31-11 5-31-11 (2)

Pipe going under my living room parallel to the back porch

5-31-11 (5)

Just pretending! :)

5-31-11 (3)

The boys bathroom

Saturday, May 28, 2011

Days 3-5

Foundation blocks are finished and the house has a shape!

0525011725

Front porch

0525011726

Garage

LOTS of fill dirt was brought in to “fill” in the house

 DSC06192 DSC06211 DSC06230DSC06232

Ready for the plumber

Tuesday, May 24, 2011

Day Two

The foundation blocks are being put in…  Tough job!

 P5240044

Looking at the front

P5240045

At the front looking to the garage side

P5240046

Back porch from inside the “kitchen”

 P5240047

From that same spot looking into the “living room”

P5240050

What a mess

P5240049

Back of house by porch

P5240051

Boys by “the tree” where we stood for the Christmas cards (with nothing but trees the 1st year and then a clearing last year).  The dog, Bryan, belongs to my parents.

Day One

The countdown…or UP has begun.  We are at Day one where the foundation crew comes to layout the house and set the footers.  ( I am learning a lot of new lingo and Dennis rolls his eyes a lot!)

    ryan musical theater singles 022 ryan musical theater singles 023 ryan musical theater singles 026 ryan musical theater singles 030 P5230028P5230030

Just missed the shot where Ryan had his arm around Preston too

P5230031

Dennis and my dad discussing Day one

P5230033

Near the front door of the “house”