After all that “beautiful” Alabama red clay was brought in and packed down, it had to be dug up in places to “rough in” the plumbing and electric that will be under the foundation. Seems crazy but I am not a plumber. The drains for tubs, showers, sinks etc. were put in.
Pipe going under my living room parallel to the back porch
Just pretending! :)
The boys bathroom
No comments:
Post a Comment